
Page 162 - 7. Chases
Pearl 2008 Manual - 16th July 2007
7.2.5 Viewing chase steps
You can preview the output of a chase
step on the display. The chase does
not have to be connected or running.
1> Press View.
2> Press the Swop button of the
chase to view.
3> Choose the attribute to view by
pressing one of the Attribute
buttons.
4> Use softkeys F and G to step
through the chase, or type a new
step number and press Enter.
• Values with a “P” indicate that a
palette has been stored in the
step; the number is the palette
number.
You can view the steps of a connected chase by pressing View then
Connect. See page
167.
7.3 Edit
7.3.1 Adding more steps to the end of a chase
You can add steps to the end of a chase by pressing Chase, then the
Swop button of the chase, and saving more steps in the same way as
you did when creating the chase. New steps you save will be added
onto the end of the chase.
7.3.2 Inserting steps into a chase
You can insert a new step into a chase using the blue Insert button.
The chase must be connected.
1> Turn on the chase, or press Connect and the chase’s Swop button.
2> Set up the lights how you want them for the new step.
3> Press the blue Insert button.
4> Type in the step number for the new step and press Enter (the
number is shown on the top line of the display). For example to
put a step in between 2 and 3, enter a step number of 2.5.
5> Set the timing for the new step (see section
7.6) and press Enter,
or just press Enter to insert the step with the default timing.
6> Repeat from 4 to insert another step, or press F [Press to quit
insert] to end.
You can renumber all steps in the chase to whole numbers by pressing
A [Renumber] while in the chase step insert menu.
Kommentare zu diesen Handbüchern